Source: https://mokxi.com/learn/path/transformers-in-practice
Updated: 2026-11-11

All paths

# Transformers in practice

The iron box between the wall and your project, measured: turns ratio, VA ratings, center taps, regulation under load, isolation, and the 24 V control transformer in every furnace.

Free 7 lessons 5 h 7 chapters 1,660 XP Electrical · Intermediate +150 XP

0 of 7 done

Start the course free Turns ratio: volts down, amps up Lesson plan for teachers

What you will build

## 0 projects, built step by step

7 lessons in 7 chapters, about 5 hours on a simulated breadboard. Free, in your browser, every step checked by the simulator.

The map

## Chapter by chapter

Each lesson opens when the one before it is done, and each chapter ends in a project.

Chapter 1

## Turns ratio

Volts down, amps up, and why DC gets nothing through.

Open 236 XP

### Turns ratio: volts down, amps up

Two coils on one iron core: the turns ratio sets the volts, the amps trade the other way, and DC gets nothing through at all.

0 of 6 steps

Start What is in it

Chapter 2

## VA rating

Half load, full load and overload on a 12 VA transformer.

Locked 236 XP

### VA rating: how much it can give

Volts times amps is the number on the label. Load a 12 VA transformer to half, to full and past it, and watch the volts sag and the copper heat.

0 of 6 steps

Chapter 3

## Center taps

Two halves and two diodes make full-wave DC.

Locked 267 XP

### Center taps and full-wave DC

A tap in the middle of the secondary gives two equal halves: with two diodes, a full-wave rectifier with half the ripple of one.

0 of 7 steps

Chapter 4

## Regulation under load

Why a 12 V transformer reads 13 V, and what a brownout adds.

Locked 236 XP

### Regulation under load

Why a 12 V transformer reads 13 V on the bench: no-load versus full-load voltage, regulation as a percentage, and what a brownout adds.

0 of 6 steps

Chapter 5

## Isolation

A floating secondary, and what it does not protect against.

Locked 218 XP

### Isolation: the secondary floats

No wire joins the windings, so a floating secondary has no path to earth. What that protects you from, and what it never does.

0 of 6 steps

Chapter 6

## 24 V control transformers

R, C, W and G, the VA budget, Class 2 and the fuse.

Locked 218 XP

### 24 V control transformers

The transformer in every furnace and air handler: R and C, the thermostat's W and G, a VA budget, and the fuse on the secondary.

0 of 6 steps

Chapter 7

## Boss project

A 24 VAC control supply with a regulated 12 V rail.

Locked 249 XP

### Boss: a 24 VAC control supply

One 24 V transformer runs a thermostat loop and a regulated 12 V DC rail: center tap, full-wave, VA budget and regulation in one build you then change.

0 of 7 steps

Syllabus

## Every lesson in the course

All 7 lessons, in order, each with what it covers. Any of them opens in the editor right away.

Chapter 1

### Turns ratio

- Turns ratio: volts down, amps up Two coils on one iron core: the turns ratio sets the volts, the amps trade the other way, and DC gets nothing through at all.

Chapter 2

### VA rating

- VA rating: how much it can give Volts times amps is the number on the label. Load a 12 VA transformer to half, to full and past it, and watch the volts sag and the copper heat.

Chapter 3

### Center taps

- Center taps and full-wave DC A tap in the middle of the secondary gives two equal halves: with two diodes, a full-wave rectifier with half the ripple of one.

Chapter 4

### Regulation under load

- Regulation under load Why a 12 V transformer reads 13 V on the bench: no-load versus full-load voltage, regulation as a percentage, and what a brownout adds.

Chapter 5

### Isolation

- Isolation: the secondary floats No wire joins the windings, so a floating secondary has no path to earth. What that protects you from, and what it never does.

Chapter 6

### 24 V control transformers

- 24 V control transformers The transformer in every furnace and air handler: R and C, the thermostat's W and G, a VA budget, and the fuse on the secondary.

Chapter 7

### Boss project

- Boss: a 24 VAC control supply One 24 V transformer runs a thermostat loop and a regulated 12 V DC rail: center tap, full-wave, VA budget and regulation in one build you then change.

Kits

## Build it on your bench too

Every lesson runs in the simulator with nothing to buy. When you want the real thing, these kits have the parts.

Have a kit already?

### Find your kit

Pick the starter kit you own and run every lesson in its manual with the same parts on the same pins.
See every kit

Questions

## About Transformers in practice

Is Transformers in practice free?

Yes. All 7 lessons of Transformers in practice are free and run in your browser, with nothing to install and no parts to buy before you start.

Do I need any parts?

No. Every circuit is built on a simulated breadboard, and the simulator checks each step as you go. When you want to build it for real, the same parts and wiring work on a real bench.

How long does Transformers in practice take?

About 5 hours: 7 lessons in 7 chapters, each one a few short steps. Your progress is kept, so you can stop after any lesson and pick up where you left off.

Where do I start?

With "Turns ratio: volts down, amps up", and each lesson builds on the one before it. New to circuits? Electronics basics is the course that starts from zero.
